Availability: | |
---|---|
• Cassman design and manufacture
• 100% TIG welding
• 4000L Net Capacity, 25% head space
• Mash+Lauter Tun + Boil Kettle + Whirlpool Tun+Hot water tank
• Lauter tun with milled false bottom, VFD motor, Sparging and CIP pipe. Level gauge
• Mash tun with electric heated or steam jacket. VFD motor for option.Level gauge
• Inner heater for the kettle
• 40 square meter Plate heat exchanger
• 5000L/H Sanitary Centrifugal pump
• Digital control panel or PLC control system
• SUS 304 tank, pipe, valves etc.
• SUS 304 platform and integrated stairs.
• Cassman design and manufacture
• 100% TIG welding
• 4000L Net Capacity, 25% head space
• Mash+Lauter Tun + Boil Kettle + Whirlpool Tun+Hot water tank
• Lauter tun with milled false bottom, VFD motor, Sparging and CIP pipe. Level gauge
• Mash tun with electric heated or steam jacket. VFD motor for option.Level gauge
• Inner heater for the kettle
• 40 square meter Plate heat exchanger
• 5000L/H Sanitary Centrifugal pump
• Digital control panel or PLC control system
• SUS 304 tank, pipe, valves etc.
• SUS 304 platform and integrated stairs.